Manufacturing and process

Automotive

Car plants build to a sequence, fed just in time by hundreds of suppliers. When one plant or one supplier stops, the line stops.

Vehicle plantsTier suppliersEV and battery

How the process runs

From coil to finished vehicle

Steel and aluminium become panels, panels become a body, the body is painted, then powertrain, battery and interior are fitted in sequence. Every vehicle is tested and its software loaded before it leaves.

  1. Stage 1: Press shop

    Steel and aluminium coils are pressed into body panels.

    Control systems
    Press line PLCsDie change automation
  2. Stage 2: Body shop

    Robots weld and join panels into the body.

    Control systems
    Robot controllersWelding controllersSafety PLCs
    Challenge3
  3. Stage 3: Paint shop

    Bodies are pre-treated, painted and cured.

    Control systems
    Paint robotsBooth and oven controlPaint shop SCADA
    Challenge3
  4. Stage 4: Powertrain and battery

    Engines, or battery modules and packs, are built and tested.

    Control systems
    Machining linesBattery assembly PLCsFormation and test systems
  5. Stage 5: Final assembly

    Trim, electronics, powertrain and wheels are fitted in the order customers ordered.

    Control systems
    Conveyor controlTorque toolsSequencing (JIS)
    Challenge1
  6. Stage 6: End-of-line

    Every vehicle is tested, its ECU software loaded and its security keys installed.

    Control systems
    ECU flashing stationsKey provisioningTest rigs
    Challenge2
Across every stage

Attackers rarely go straight for a controller. They travel through these shared systems, so this is where we look first.

MES and sequencingSupplier EDI linksLine builder remote accessEngineering laptops
Challenge4

For product makers

Building equipment for the automotive industry?

Vehicle components follow UN R155 and sit outside the CRA. The equipment that builds and charges vehicles does not: robots, test systems and EV chargers sold in the EU fall under the CRA, and machines also under the Machinery Regulation.

What makers build
  • Robots and welding systems
  • End-of-line and ECU flashing systems
  • Battery production equipment
  • EV chargers
  • Plant software
What customers and regulators ask of the product
EU Cyber Resilience Act

Production equipment, chargers and software sold in the EU need CE marking under the CRA from 11 December 2027.

RED Delegated Act

Internet-connected chargers and other radio equipment have had to meet the RED cybersecurity requirements since 1 August 2025, usually shown with EN 18031.

EU Machinery Regulation 2023/1230

Due to apply from 20 January 2027 for robots, test rigs and other machines.

For plant owners

Where it gets hard, and how we tackle it

We start from how your process runs, fix what matters most first, and use what you already own wherever we can.

  1. One supplier can stop every plant

    In March 2022, Toyota stopped all 14 of its plants in Japan for a day after malware hit Kojima Industries, one of its parts suppliers. Just-in-time leaves no buffer. Source: Toyota

    How we tackle it

    For suppliers, a practical programme that holds up in OEM audits and TISAX. For vehicle plants, a plan for running when a key supplier goes dark.

    Cybersecurity Program
  2. End-of-line holds the vehicle's secrets

    Flashing stations and key provisioning handle the software and cryptographic keys that protect the car on the road. UN R155 requires the manufacturer's cybersecurity management system to cover production, not only design.

    How we tackle it

    We secure end-of-line as a crown-jewel zone: isolated network, controlled key handling, signed software, and logs that support your R155 evidence.

    Risk Assessment
  3. Hundreds of robots, many line builders

    Body and paint shops run hundreds of robots and PLCs installed by different line builders, many with default passwords and their own remote access.

    How we tackle it

    A passive asset inventory, a zone design for each shop, and one managed remote access route for every line builder. New security tools are tried on a testbed with your PLC models first.

    Gap Assessment
  4. Plant and IT are tightly bound

    Sequencing, MES and supplier links tie the line to IT. A cyberattack stopped Jaguar Land Rover's production for about five weeks in 2025, and in 2020 one disrupted Honda plants in several countries, including India.

    How we tackle it

    We define what the plant needs from IT to keep building, separate it, and rehearse recovery with production, IT and management together.

    Incident Response TTX

Where plant owners usually start

Three ways in

Rules and standards

What applies in automotive

  • IEC 62443International

    Zones, conduits and remote access for press, body, paint and assembly shops.

  • UN R155UNECE, required in the EU

    Vehicle cybersecurity management system covering development, production and post-production. Required for all new vehicles in the EU since July 2024.

  • TISAXAutomotive industry

    Information security assessment used across the supply chain, including prototype protection.

  • AIS-189India

    India's standard for vehicle cybersecurity management. Draft rules published in June 2026 propose making it mandatory in phases.

  • NIS2European Union

    Covers manufacturers of motor vehicles above size thresholds.

Talk to RelyBlue

Operating in automotive?

An honest conversation about your OT environment. No sales pressure, no fear tactics.

  • You talk to a senior advisor, never a salesperson